Station 82 Remodel

Construction Phase   


Aug. 4, 2008 The beginning of the station remodel.

Aug. 13 2008 The NW side of the building.

Oct. 3, 2008 Patio, Captain's office, resource room, and bunk rooms on the west side of the building.

Oct. 3, 2008 Addition of patio, Captain's office, resource room and bunk rooms to the NW side.

Oct. 3, 2008 Construction on the conference room. The ceilings were raised, windows added and square footage increased.

Oct. 14, 2008 The entryway was entirely

Oct. 27, 2008 Addition of a Decontamination room on the NE side of the building which is temporarily being used as the Fire Chief's office.

Nov. 18, 2008 This is an inside view of the the conference room.

Nov. 18, 2008 Siding is added to the building's exterior. Pictured above is the Decontamination room.

Nov. 18, 2008 Insulation installed in the dorm room hallway.

Dec. 15, 2008 Drywall in the dorm room hallway and the rest of the building has been installed.

Dec. 15, 2008 Window frames are added to the firefighter fitness room.

Dec. 15, 2008 Looking at the kitchen from the day room. Things are moving forward!

Dec. 15, 2008 The rockwork around the building has been completed. The back patio awaits a concrete slab and a fence.

Dec. 15, 2008 The entryway awaits windows and a door. Rockwork will be added above the entryway.

Jan. 9, 2009 A 100 kilowatt diesel generator is installed. The generator will allow the station to run five days at full capacity.

Jan. 9, 2009 Tile is laid throughout the station hallways, kitchen and entryway.

Jan. 30, 2009 The back patio now has a concrete slab and a fence.

Jan. 30, 2009 Flooring is added to the firefighter fitness room.

Feb. 25, 2009 Forty-five food lockers are ready for use.

March 13, 2009 The LSF Patch is etched into the glass separating the entryway from the firefighter quarters.

Station 82 lettering is hung above the bay doors to the fire station.

May 2009, Outdoor Signage for Station 82 is hung
 

 

   

 