Aug. 4, 2008 The beginning of the station remodel. |

Aug. 13 2008 The NW side of the building. |

Oct. 3, 2008 Patio, Captain's office, resource room,
and bunk rooms on the west side of the building. |

Oct. 3, 2008 Addition of patio, Captain's office,
resource room and bunk rooms to the NW side. |

Oct. 3, 2008 Construction on the conference room.
The ceilings were raised, windows added and
square footage increased. |

Oct. 14, 2008 The entryway was entirely |

Oct. 27, 2008 Addition of a Decontamination room on
the NE side of the building which is temporarily
being used as the Fire Chief's office. |

Nov. 18, 2008 This is an inside view of the the
conference room. |

Nov. 18, 2008 Siding is added to the building's
exterior. Pictured above is the Decontamination
room. |

Nov. 18, 2008 Insulation installed in
the dorm room hallway. |

Dec. 15, 2008 Drywall in the
dorm room hallway
and the rest of the building has been installed.
|

Dec. 15, 2008 Window
frames are added to the
firefighter fitness room. |

Dec. 15, 2008 Looking at the kitchen from the day
room. Things are moving forward! |

Dec. 15, 2008 The rockwork around the building
has been completed. The back patio awaits a
concrete slab and a fence.
|

Dec. 15, 2008 The entryway awaits windows and
a door. Rockwork will be added above the
entryway. |

Jan. 9, 2009 A 100 kilowatt diesel generator is
installed. The generator will allow the
station to run five days
at full capacity. |

Jan. 9, 2009 Tile is laid throughout the station
hallways, kitchen and entryway. |

Jan. 30, 2009 The back patio now has a concrete
slab and a fence. |

Jan. 30, 2009 Flooring is added to the firefighter
fitness room. |

Feb. 25, 2009 Forty-five food lockers are ready for
use. |

March 13, 2009 The LSF Patch is etched into the
glass separating the entryway from the
firefighter quarters. |

Station
82 lettering is hung above the bay doors to the fire
station. |

May 2009, Outdoor
Signage for Station 82 is hung |
|